• en English
  • ar العربية
Thursday, 18 June, 2026
No Result
View All Result
دير الزور 24 - Deir EzZor 24
No Result
View All Result
Home Al-Raqqa

The Technical Services Directorate in Raqqa continues to rehabilitate roads and implement cleaning campaigns in the town of Solok

18/06/2026
in Al-Raqqa
A A
The Technical Services Directorate in Raqqa continues to rehabilitate roads and implement cleaning campaigns in the town of Solok
25
VIEWS
شارك على فيسبوكغرد على X

This post is also available in: العربية

The Technical Services Directorate in Raqqa Governorate continues to implement its service work in the town of Solok, as part of its plan to improve the infrastructure and raise the level of services provided to the residents.

The technical crews carried out rehabilitation and maintenance work on the Corniche Road using gravel material, in addition to repairing a number of damaged roads within the town, which contributes to improving the condition of the road network and facilitating the movement of vehicles and citizens.

The work also included implementing a public cleaning campaign targeting a number of streets and neighborhoods, in addition to relocating and preparing the town’s service landfill, with the aim of reducing waste accumulation, improving the environmental situation, and preserving public health.

The Technical Services Directorate confirmed that these works come within its ongoing efforts to enhance traffic safety and improve the civilized appearance of the towns and areas affiliated with the governorate, noting the continued implementation of service projects in various parts of Raqqa to meet the needs of residents and raise the quality of basic services.

Tags: town of Solok
ShareTweetSendShare
Previous Post

Rehabilitation work continues on Deir Ezzor – Al-Mayadeen – Al-Bukamal road to enhance traffic safety and improve infrastructure

🧐

No Content Available
Load More

Leave a Reply

Your email address will not be published. Required fields are marked *

three × 4 =

  • The Technical Services Directorate in Raqqa continues to rehabilitate roads and implement cleaning campaigns in the town of Solok

    The Technical Services Directorate in Raqqa continues to rehabilitate roads and implement cleaning campaigns in the town of Solok

    1 shares
    Share 0 Tweet 0
  • Rehabilitation work continues on Deir Ezzor – Al-Mayadeen – Al-Bukamal road to enhance traffic safety and improve infrastructure

    1 shares
    Share 0 Tweet 0
  • The Technical Services Directorate in Raqqa continues to rehabilitate roads and implement cleaning campaigns in the town of Solok

    1 shares
    Share 0 Tweet 0
  • Rehabilitation work continues on Deir Ezzor – Al-Mayadeen – Al-Bukamal road to enhance traffic safety and improve infrastructure

    1 shares
    Share 0 Tweet 0
  • Raqqa Electricity Company continues to install electronic meters in Al-Twasoaya neighborhood district

    1 shares
    Share 0 Tweet 0
The Technical Services Directorate in Raqqa continues to rehabilitate roads and implement cleaning campaigns in the town of Solok
Al-Raqqa

The Technical Services Directorate in Raqqa continues to rehabilitate roads and implement cleaning campaigns in the town of Solok

by Editorial Board
18/06/2026
0

...

Read moreDetails
Rehabilitation work continues on Deir Ezzor – Al-Mayadeen – Al-Bukamal road to enhance traffic safety and improve infrastructure

Rehabilitation work continues on Deir Ezzor – Al-Mayadeen – Al-Bukamal road to enhance traffic safety and improve infrastructure

18/06/2026
Raqqa Electricity Company continues to install electronic meters in Al-Twasoaya neighborhood district

Raqqa Electricity Company continues to install electronic meters in Al-Twasoaya neighborhood district

18/06/2026
Technical services crews in Raqqa continue to remove remnants of war on the Raqqa – Deir Ezzor road

Technical services crews in Raqqa continue to remove remnants of war on the Raqqa – Deir Ezzor road

18/06/2026
Mohassan West Station restarted after repairing a technical fault and resuming water pumping for 20,000 people

Mohassan West Station restarted after repairing a technical fault and resuming water pumping for 20,000 people

17/06/2026
  • Featured news
  • Interviews
  • Studies
  • Articles
  • Info Graphic
  • Reports
  • Maps
  • Forefathers land
  • Press
  • Photos from Homeland
  • Video Graphic
  • D24 Magazine
Designed and developed by 

DeirezZor24: Speaking Reality, Building Awareness

No Result
View All Result
  • Featured news
  • News
    • Eastern countryside
    • Deir ez-Zor City
    • Eastern & western countryside
    • Western countryside
    • Northern countryside
  • Reports
  • Violations
    • Daesh
    • Syrian regime
  • العربية

DeirezZor24: Speaking Reality, Building Awareness