This post is also available in: العربية
DeirEzzor24 exclusive report:
Deir Ezzor 24 network learned that the governor, the party branch secretary and the police chief attended the dirt bridge in Deir Ezzor, against the background of the appearance of a large crack on the northern side of the bridge, at the place where the metal bridge was connected to cutting the calipers.
The meeting was attended by the captain, the engineer supervising the implementation, for rapid treatment, as the Euphrates water witnessed a rise in the water level and a density of plankton; As a result of the rain floods that occurred yesterday in Raqqa.
The new bridge is witnessing a blockage in the pipes, and a strong deviation in the water course to the northern side, and the warnings of the primitive and random construction of the new bridge, whose construction was supervised by the Fourth Division, and adopted by the Iranian Construction Jihad Organization, continued during the period of its construction, but it was ignored by the Fourth Division.