This post is also available in: العربية
The article’s picture is expressive
DeirEzzor24 exclusive report:
Most road projects in areas under the control of the Assad regime in Deir ez-Zor province have come to a halt, according to a local reporter of DeirEzzor24.
Accoding to our reporter; all the projects, including extending the asphalt road, spraying the material MC0 (MS zero), leveling and paving the remaining parts with bitumen, and water spraying, have stopped due to the high cost of fuels and the doubling of prices compared to the estimated estimates prepared by the Technical Services Directorate.
Most of these projects are carried out by the public sector represented by the Roads and Bridges Company (RODICO).