Continuous maintenance work on the water network in Al-Bhara in the Deir Ezzor countryside to improve service

This post is also available in: العربية

Intensive maintenance work continues in the town of Al-Bhara in the eastern countryside of Deir Ezzor, carried out by the maintenance workshop of  Hajin Water Unit, as part of efforts aimed at improving the status of water services and completely rehabilitating the network.

The work began more than ten days ago, and includes repairing the main and secondary water network lines that had been suspended for a long time, causing great suffering for the residents in securing potable water.

The workshop operates continuously around the clock, using mechanisms and technical personnel to carry out excavation and repair operations, followed by road rehabilitation work and returning them to their previous condition.

The head of the water unit confirmed that maintenance work will continue until the full completion of the rehabilitation of the water station and the network, in preparation for restarting it and ensuring that water reaches the people on a regular basis.

Show More

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

1 × 5 =

Back to top button