• en English
  • ar العربية
Wednesday, 5 August, 2026
No Result
View All Result
دير الزور 24 - Deir EzZor 24
No Result
View All Result
Home News Deir ez-Zor City

Expanded Meeting in Deir Ezzor to Evaluate Implemented Projects

17/12/2025
in Deir ez-Zor City
A A
Expanded Meeting in Deir Ezzor to Evaluate Implemented Projects
25
VIEWS
شارك على فيسبوكغرد على X

This post is also available in: العربية

An expanded meeting was held yesterday with the participation of the Governor of Deir Ezzor, a number of local officials, and representatives of the organization, to discuss the status of implemented projects and future work prospects in the governorate.

The meeting included a detailed presentation of the projects implemented by UNICEF during 2025, which covered vital sectors, most notably support for the education and health sectors, improvement of water and sanitation services, as well as child protection programs and capacity-building for local staff.

Participants confirmed that these projects have made a tangible contribution to improving living conditions for children and the most vulnerable families, and have helped enhance social stability in several areas of the governorate.

During the meeting, UNICEF also presented its future plans for 2026, which focus on strengthening sustainable development and expanding humanitarian programs to reach broader segments of the population, with an emphasis on long-term solutions that support self-reliance and improve the quality of basic services. The proposed plans stressed the importance of partnership with local entities to ensure the sustainability and effectiveness of the projects.

For his part, the Governor of Deir Ezzor emphasized the importance of the role played by UNICEF in supporting the governorate, praising the efforts made over recent years and affirming the readiness of local authorities to provide the necessary facilitation to ensure the success of future plans. He also called for enhanced joint coordination to achieve the best results in terms of humanitarian and service-related development.

This meeting comes within the context of ongoing efforts to evaluate performance and improve the quality of humanitarian and development interventions, in line with the needs of Deir Ezzor Governorate and the aspirations of its residents for a more stable and developed future.

Tags: UNICEF
ShareTweetSendShare
Previous Post

A Development Workshop in Deir Ezzor on Sustainable Local Plans

Next Post

Deir Ezzor Representatives Meet Community Groups to Discuss Legislative Challenges

🧐

Rehabilitation of Abu Khashab water pumping system enhances water supply to 45,000 people in Deir Ezzor

Rehabilitation of Abu Khashab water pumping system enhances water supply to 45,000 people in Deir Ezzor

16/07/2026
With support from UNICEF.. Launching a project to rehabilitate the Tabiya water station to serve 20,000 people in Deir Ezzor countryside

With support from UNICEF.. Launching a project to rehabilitate the Tabiya water station to serve 20,000 people in Deir Ezzor countryside

09/07/2026
Rehabilitating sewage grids in Al-Busayrah to serve approximately 50,000 people

Rehabilitating sewage grids in Al-Busayrah to serve approximately 50,000 people

06/07/2026
Load More

Leave a Reply

Your email address will not be published. Required fields are marked *

3 × 2 =

  • بعد انقطاع 14 عاماً.. الاتصالات تعيد خدمة الهاتف إلى حي العمال بدير الزور

    بعد انقطاع 14 عاماً.. الاتصالات تعيد خدمة الهاتف إلى حي العمال بدير الزور

    1 shares
    Share 0 Tweet 0
  • منفذ البوكمال الحدودي يسجل حركة عبور متنامية واستقبال آلاف العائدين من العراق

    1 shares
    Share 0 Tweet 0
  • غرفة تجارة وصناعة دير الزور تؤهل الشباب لسوق العمل بدورة تدريبية تجمع بين الريادة والتطبيق العملي

    1 shares
    Share 0 Tweet 0
  • Deir Ezzor City Council issues new instructions to regulate construction work and enhance public safety

    1 shares
    Share 0 Tweet 0
  • Rehabilitation work on the Al-Seyasya Bridge in Deir Ezzor is progressing And the bridge lifter is 95% complete

    1 shares
    Share 0 Tweet 0
Deir Ezzor City Council issues new instructions to regulate construction work and enhance public safety
Deir ez-Zor City

Deir Ezzor City Council issues new instructions to regulate construction work and enhance public safety

by Editorial Board
04/08/2026
0

...

Read moreDetails
Experimental water pumping in Tal Tamr and Al-Tawina in Hasakah. The company warns against using it for drinking

Experimental water pumping in Tal Tamr and Al-Tawina in Hasakah. The company warns against using it for drinking

04/08/2026
Rehabilitation work on the Al-Seyasya Bridge in Deir Ezzor is progressing And the bridge lifter is 95% complete

Rehabilitation work on the Al-Seyasya Bridge in Deir Ezzor is progressing And the bridge lifter is 95% complete

04/08/2026
Al-Hasakah receives 1.15 million tons of wheat amid storage capacity challenges

Al-Hasakah receives 1.15 million tons of wheat amid storage capacity challenges

02/08/2026
The Technical Services Directorate begins the rehabilitation of the earthy bridge connecting the Kanamat and Hawijat Sakr neighborhoods in Deir Ezzor

The Technical Services Directorate begins the rehabilitation of the earthy bridge connecting the Kanamat and Hawijat Sakr neighborhoods in Deir Ezzor

02/08/2026
  • Featured news
  • Interviews
  • Studies
  • Articles
  • Info Graphic
  • Reports
  • Maps
  • Forefathers land
  • Press
  • Photos from Homeland
  • Video Graphic
  • D24 Magazine
Designed and developed by 

DeirezZor24: Speaking Reality, Building Awareness

No Result
View All Result
  • Featured news
  • News
    • Eastern countryside
    • Deir ez-Zor City
    • Eastern & western countryside
    • Western countryside
    • Northern countryside
  • Reports
  • Violations
    • Daesh
    • Syrian regime
  • العربية

DeirezZor24: Speaking Reality, Building Awareness