• en English
  • ar العربية
Tuesday, 21 July, 2026
No Result
View All Result
دير الزور 24 - Deir EzZor 24
No Result
View All Result
Home News Eastern countryside

A project to rehabilitate sewage networks in Al-Quria and Mahkan

29/04/2026
in Eastern countryside
A A
A project to rehabilitate sewage networks in Al-Quria and Mahkan
25
VIEWS
شارك على فيسبوكغرد على X

This post is also available in: العربية

The General Corporation for Drinking Water and Sanitation in Deir Ezzor in cooperation with Oxfam, continues to implement an integrated project to rehabilitate and improve sewage networks in the city of Al-Quria and the town of Mehkan, as part of the “Deir Ezzor Spring” campaign aimed at raising the level of basic services in the area.

The project includes a package of vital works aimed at addressing existing problems in the network, as the works include detecting and isolating inspection rooms, clearing sewage lines, in addition to implementing point repairs to the damaged parts of the network.

Polyethylene pipes with a diameter of 40 cm are also being installed, rain gusts are being implemented to drain rainwater, in addition to maintenance work for existing lifting stations.

As part of enhancing the system’s efficiency, the project also includes the installation of a new sewage pumping station with a capacity of 100 cubic meters per hour and a lifting capacity of up to 7 meters, which will contribute to improving the flow of sewage and preventing bottlenecks in the network.

The project aims to serve approximately 12,000 people in Al-Quria and Mehkan, which will positively impact service and health conditions, contribute to improving residents’ living conditions, and reduce environmental risks associated with weak sewage networks.

Tags: Al-QuriaMehkanOxfam
ShareTweetSendShare
Previous Post

Obligating employers in Deir Ezzor to document workers’ contracts before paying insurance

Next Post

Delivery of the rehabilitation site of Mohsen Automated Bakery in Deir Ezzor to enhance bread production

🧐

The article's picture is expressive

A Fourth Division checkpoint in the south of Deir Ezzor is holding shipments for international organizations

06/06/2024
Load More

Leave a Reply

Your email address will not be published. Required fields are marked *

4 × three =

  • أكثر من 33 ألف طن من القمح في صوامع خس عالج بالرقة

    أكثر من 33 ألف طن من القمح في صوامع خس عالج بالرقة

    1 shares
    Share 0 Tweet 0
  • استكمال أعمال صيانة طريق دير الزور – الرقة وتحسين المقاطع الأكثر تضرراً

    1 shares
    Share 0 Tweet 0
  • Launching of a training workshop to develop union capabilities for Deir Ezzor workers with the participation of three governorates

    1 shares
    Share 0 Tweet 0
  • 40 homes were inspected in Al-Huwaiqah neighborhood in preparation for their restoration, with support from the Al-Birr Wal-Ihsan Association

    1 shares
    Share 0 Tweet 0
  • Launching of a training workshop to develop union capabilities for Deir Ezzor workers with the participation of three governorates

    1 shares
    Share 0 Tweet 0
Launching of a training workshop to develop union capabilities for Deir Ezzor workers with the participation of three governorates
Deir ez-Zor City

Launching of a training workshop to develop union capabilities for Deir Ezzor workers with the participation of three governorates

by Editorial Board
20/07/2026
0

...

Read moreDetails
40 homes were inspected in Al-Huwaiqah neighborhood in preparation for their restoration, with support from the Al-Birr Wal-Ihsan Association

40 homes were inspected in Al-Huwaiqah neighborhood in preparation for their restoration, with support from the Al-Birr Wal-Ihsan Association

20/07/2026
The start of the rehabilitation project for  Al-Furat central mill in Deir Ezzor

The start of the rehabilitation project for Al-Furat central mill in Deir Ezzor

19/07/2026
Termination of the investment contract for the Al-Tebni bakery in Deir Ezzor after monitoring food and health violations

Termination of the investment contract for the Al-Tebni bakery in Deir Ezzor after monitoring food and health violations

19/07/2026
Reconnecting the second generation group at the Kdiran Dam to the electrical grid after completing its periodic maintenance

Reconnecting the second generation group at the Kdiran Dam to the electrical grid after completing its periodic maintenance

18/07/2026
  • Featured news
  • Interviews
  • Studies
  • Articles
  • Info Graphic
  • Reports
  • Maps
  • Forefathers land
  • Press
  • Photos from Homeland
  • Video Graphic
  • D24 Magazine
Designed and developed by 

DeirezZor24: Speaking Reality, Building Awareness

No Result
View All Result
  • Featured news
  • News
    • Eastern countryside
    • Deir ez-Zor City
    • Eastern & western countryside
    • Western countryside
    • Northern countryside
  • Reports
  • Violations
    • Daesh
    • Syrian regime
  • العربية

DeirezZor24: Speaking Reality, Building Awareness