• fa فارسی
  • en English
  • ar العربية
Saturday, 18 April, 2026
No Result
View All Result
دير الزور 24 - Deir EzZor 24
No Result
View All Result
Home News Eastern countryside

The Iranian Cultural Center resumes its activities in Al-Mayadin

14/05/2024
in Eastern countryside
A A
The article's picture is expressive

The article's picture is expressive

6
SHARES
149
VIEWS
شارك على فيسبوكغرد على X

This post is also available in: العربية

DeirEzzor24 exclusive report

The Iranian Cultural Center in the city of Al-Mayadeen, east of Deir Ezzor, has returned to its summer activities again, according to a DeirEzzor24 network local reporter.

According to our reporter, the Iranian Cultural Center announced a set of strengthening courses for certificate students (preparatory and secondary) at nominal prices, and human development and arts courses that include both genders.

He pointed out that the center is preparing to hold recreational trips to the “Ain Ali” shrine in the Al-Quria desert, east of Deir Ezzor, and to sites in Deir Ezzor, after weather conditions stabilize.

It is noteworthy that these courses are held at the headquarters of the Iranian Cultural Center on Al-Arbaeen Street in Al-Mayadin City.

Tags: Ain AlAlQuria
Share2Tweet2SendShare
Previous Post

Iranian-backed militias receive a shipment of weapons in Deir Ezzor

Next Post

Customs restricts pharmacists and shopkeepers in the Mayadin city

🧐

No Content Available
Load More
  • Installation of a solar energy system at the Baghouz water station

    Installation of a solar energy system at the Baghouz water station

    1 shares
    Share 0 Tweet 0
  • Rehabilitation of the Olouk water station in preparation for resuming pumping to Hasakah and Tal Tamr

    1 shares
    Share 0 Tweet 0
  • Rehabilitation of the Olouk water station in preparation for resuming pumping to Hasakah and Tal Tamr

    1 shares
    Share 0 Tweet 0
  • Installation of a solar energy system at the Baghouz water station

    1 shares
    Share 0 Tweet 0
  • “Deir Ezzor Spring” Campaign Continues to Remove Rubble and Improve Services and Infrastructure in the city

    1 shares
    Share 0 Tweet 0
Rehabilitation of the Olouk water station in preparation for resuming pumping to Hasakah and Tal Tamr
Al-Hasaka

Rehabilitation of the Olouk water station in preparation for resuming pumping to Hasakah and Tal Tamr

by Editorial Board
18/04/2026
0

...

Read moreDetails
Installation of a solar energy system at the Baghouz water station

Installation of a solar energy system at the Baghouz water station

18/04/2026
“Deir Ezzor Spring” Campaign Continues to Remove Rubble and Improve Services and Infrastructure in the city

“Deir Ezzor Spring” Campaign Continues to Remove Rubble and Improve Services and Infrastructure in the city

16/04/2026
Raqqa City Council continues to maintain lighting and launches a plan to improve roads and general appearance

Raqqa City Council continues to maintain lighting and launches a plan to improve roads and general appearance

16/04/2026
Raqqa Health Directorate continues the campaign to vaccinate pilgrims and register 800 beneficiaries so far

Raqqa Health Directorate continues the campaign to vaccinate pilgrims and register 800 beneficiaries so far

16/04/2026
  • Featured news
  • Interviews
  • Studies
  • Articles
  • Info Graphic
  • Reports
  • Maps
  • Forefathers land
  • Press
  • Photos from Homeland
  • Video Graphic
  • D24 Magazine
Designed and developed by 

DeirezZor24: Speaking Reality, Building Awareness

No Result
View All Result
  • Featured news
  • News
    • Eastern countryside
    • Deir ez-Zor City
    • Eastern & western countryside
    • Western countryside
    • Northern countryside
  • Reports
  • Violations
    • Daesh
    • Syrian regime
  • العربية

DeirezZor24: Speaking Reality, Building Awareness