• en English
  • ar العربية
Sunday, 16 August, 2026
No Result
View All Result
دير الزور 24 - Deir EzZor 24
No Result
View All Result
Home News Eastern countryside

Deir Ezzor Electricity Directorate carries out maintenance work in the eastern countryside of the province

08/02/2025
in Eastern countryside
A A
The article's picture is expressive

The article's picture is expressive

5
SHARES
128
VIEWS
شارك على فيسبوكغرد على X

This post is also available in: العربية

Deir Ezzor Electricity Company carried out maintenance and replacement operations for electricity transformers in the town of Baqras in the eastern countryside of Deir Ezzor, according to a reporter of the DeirEzzor24 Network.

Our correspondent said that the company replaced the “Jarnoua’a Gathering” transformer in the town of Baqras Tahtani from a capacity of 100 KVA to a capacity of 200 KVA, and the “Well Gathering” transformer in the town of Baqras Tahtani was replaced from a capacity of 50 KVA to a capacity of 100 KVA.

These operations aim to relieve these centers and increase the capacities of the existing centers with higher capacities.

Tags: Baqras
Share2Tweet1SendShare
Previous Post

No solution yet to landmines in Deir Ezzor, despite mounting civilian casualties

Next Post

The SDF releases 5 young men from Deir Ezzor after a one-year-long arbitrary detention

🧐

The article's picture is expressive

Fatemiyoun militia deploys anti-aircraft patrols around al-Mayadeen

29/08/2024
Load More

Leave a Reply

Your email address will not be published. Required fields are marked *

8 − 6 =

  • 30 طفلاً يستفيدون من معاينات قلبية مجانية ضمن حملة شفاء 4 في الرقة

    30 طفلاً يستفيدون من معاينات قلبية مجانية ضمن حملة شفاء 4 في الرقة

    1 shares
    Share 0 Tweet 0
  • حملة “بأيدينا نخليها أجمل” تنطلق في دير الزور

    1 shares
    Share 0 Tweet 0
  • Deir Ezzor Electricity equips the second transformer with a capacity of 125 mega volts

    1 shares
    Share 0 Tweet 0
  • After 12 years.. Families of Shaitat massacre victims continue to search for missing persons

    1 shares
    Share 0 Tweet 0
  • Deir Ezzor Electricity equips the second transformer with a capacity of 125 mega volts

    1 shares
    Share 0 Tweet 0
Deir Ezzor Electricity equips the second transformer with a capacity of 125 mega volts
Eastern & western countryside

Deir Ezzor Electricity equips the second transformer with a capacity of 125 mega volts

by Editorial Board
16/08/2026
0

...

Read moreDetails
After 12 years.. Families of Shaitat massacre victims continue to search for missing persons

After 12 years.. Families of Shaitat massacre victims continue to search for missing persons

16/08/2026
Post offices in Hasakah continue to operate on Fridays and Saturdays to pay salaries and exchange currency

Post offices in Hasakah continue to operate on Fridays and Saturdays to pay salaries and exchange currency

15/08/2026
The first direct and regular flights between Cologne, Germany, and Deir Ezzor, starting in September

The first direct and regular flights between Cologne, Germany, and Deir Ezzor, starting in September

15/08/2026
Opening of a modern drinking water desalination plant in Markada, Hasakah countryside

Opening of a modern drinking water desalination plant in Markada, Hasakah countryside

14/08/2026
  • Featured news
  • Interviews
  • Studies
  • Articles
  • Info Graphic
  • Reports
  • Maps
  • Forefathers land
  • Press
  • Photos from Homeland
  • Video Graphic
  • D24 Magazine
Designed and developed by 

DeirezZor24: Speaking Reality, Building Awareness

No Result
View All Result
  • Featured news
  • News
    • Eastern countryside
    • Deir ez-Zor City
    • Eastern & western countryside
    • Western countryside
    • Northern countryside
  • Reports
  • Violations
    • Daesh
    • Syrian regime
  • العربية

DeirezZor24: Speaking Reality, Building Awareness