This post is also available in: العربية
DeirEzzor24 exclusive report:
The dirt bridge connecting Al-Husseiniya and Deir Ezzor entered into force, as the Fourth Division allowed cars to pass, two days after allowing pedestrians to cross.
The Deir Ezzor 24 network monitored the crossing of vehicles and tippers loaded with building materials, while the engineering mechanisms are still making some modifications on the southern side of the bridge, which is 7 meters wide and 220 meters long.
The bridge consists of metal pipes, stacked randomly at the bottom of the river, lacking engineering and physical studies related to the course of the river and its level, which made the engineer supervising the bridge, warn of a humanitarian disaster, describing the construction work of the bridge as primitive.