
Maintenance of submersible pumps in Amuda.. Technical efforts to enhance the stability of drinking water in the Hasakah countryside
This post is also available in:
The General Company for Drinking Water and Wastewater in Al-Hasakah Governorate continues to implement its field work aimed at maintaining and rehabilitating the facilities and components of the water system, as part of its efforts to maintain the continuity of drinking water pumping and improve the level of services provided to residents in various areas of the governorate.
In this context, the company’s technical workshops, in cooperation with Action Against Hunger (ACF), carried out work to withdraw the submersible pumps of two wells in the Amuda Water Unit in the Hasakah countryside, in preparation for carrying out the necessary technical maintenance work and returning them to service as soon as possible.
The work included withdrawing the submersible pump of well No. 9, which operates with a capacity of 100 horsepower, and the pump of well No. 15, which has a capacity of 75 horsepower, after starting the technical procedures required to subject them to maintenance and ensure their operational readiness, which contributes to restoring their ability to pump water and enhancing the performance of the supply network.
This step comes within the company’s periodic maintenance and technical intervention program to address malfunctions that may affect the operation of wells and pumping stations, especially since submersibles are a key component in operating wells and ensuring water access to networks and beneficiary areas.
Maintenance work is of particular importance in light of the ongoing need to maintain the readiness of water sources and ensure the stability of pumping operations. Failure of any technical equipment could impact the available water supply and the regularity of its access to citizens.
By implementing these works in cooperation with Action Against Hunger, the technical workshops seek to accelerate repair and rehabilitation processes, and reduce periods of well downtime, ensuring that equipment is restarted in accordance with the necessary technical requirements.
These works fall within the plan of the General Company for Drinking Water and Wastewater in Hasakah, which aims to maintain the stability of the water system, raise the efficiency of operating wells and associated equipment, and improve the condition of drinking water supply in the beneficiary areas.
These efforts also reflect the importance of coordination and cooperation between service institutions and humanitarian organizations in implementing maintenance and rehabilitation projects, and providing the necessary support to continue basic services, most notably drinking water services, which are directly linked to the daily lives and public health of the residents.
It is expected that returning the two submersibles to service, after completing maintenance work, will contribute to supporting the operational capacity of the Amuda Water Unit and enhancing the continuity of water pumping, which will help improve the level of service and reduce the impact of technical malfunctions on citizens.
These field efforts underscore the importance of continuing preventive and curative maintenance of the water sector’s components, as it is essential to preserve service infrastructure, ensure the sustainability of available water resources, and meet the needs of the population in rural Hasakah Governorate.






