Maizila Dam is ready. 10 million cubic meters to support water security in the Deir Ezzor desert

This post is also available in: العربية

The Water Resources Directorate in Deir Ezzor Governorate has completed the maintenance and rehabilitation work of the Maizilah Dam in the desert, after about 15 years of absence of comprehensive maintenance work, in a step aimed at enhancing the dam’s readiness to receive rainwater and floods, raising its operational efficiency, and maintaining its structural safety.

The rehabilitation works included maintaining the dam body, inspection rooms and gates, in addition to treating cavities, which contributes to reducing the risk of water leakage, improving the dam’s ability to hold and store rainwater, and ensuring optimal use of it.

The storage capacity of the Maizilah Dam is approximately 10 million cubic meters, giving it strategic importance in supporting water security in the desert areas, particularly during periods of drought and rainfall scarcity. It constitutes a water reserve that can be utilized to meet the needs of residents and livestock farmers, support their livelihood stability, and protect their livestock.

The importance of dam rehabilitation is not limited to enhancing water reserves, but extends to its role in reducing the risks of floods and torrents, by increasing its ability to absorb rainwater and surface runoff.

The completion of these works comes within the framework of efforts aimed at maintaining and rehabilitating irrigation and water facilities, maintaining the sustainability of water resources, and enhancing their ability to cope with climatic conditions, in a way that serves local communities in the Deir Ezzor desert.

Show More

Leave a Reply

Your email address will not be published. Required fields are marked *

1 × four =

Back to top button