• en English
  • ar العربية
Sunday, 16 August, 2026
No Result
View All Result
دير الزور 24 - Deir EzZor 24
No Result
View All Result
Home News Eastern & western countryside

Deir Ezzor Electricity equips the second transformer with a capacity of 125 mega volts

16/08/2026
in Eastern & western countryside
A A
Deir Ezzor Electricity equips the second transformer with a capacity of 125 mega volts
25
VIEWS
شارك على فيسبوكغرد على X

This post is also available in: العربية

Deir Ezzor Electricity Company announced that the power transmission crews have completed the work of equipping and installing the second transformer with a capacity of 125 megavolt-ampere, after more than four weeks of continuous work.

The company explained that a trial tension was applied to the transformer, in preparation for its entry into active service starting today, after ensuring its safe operation and stability.

According to information, electricity is expected to begin arriving throughout Deir Ezzor Governorate this evening, while the capacity currently allocated to the governorate is about 75 megawatts, with the possibility of receiving up to 125 megawatts.

The company indicated that the capacity will be increased gradually, with the aim of ensuring the stability of the transformer and avoiding any technical malfunctions during the first stages of operation.

Tags: Deir Ezzor Electricity
ShareTweetSendShare
Previous Post

After 12 years.. Families of Shaitat massacre victims continue to search for missing persons

🧐

No Content Available
Load More

Leave a Reply

Your email address will not be published. Required fields are marked *

four × 1 =

  • Deir Ezzor Electricity equips the second transformer with a capacity of 125 mega volts

    Deir Ezzor Electricity equips the second transformer with a capacity of 125 mega volts

    1 shares
    Share 0 Tweet 0
  • After 12 years.. Families of Shaitat massacre victims continue to search for missing persons

    1 shares
    Share 0 Tweet 0
  • Deir Ezzor Electricity equips the second transformer with a capacity of 125 mega volts

    1 shares
    Share 0 Tweet 0
  • After 12 years.. Families of Shaitat massacre victims continue to search for missing persons

    1 shares
    Share 0 Tweet 0
  • Post offices in Hasakah continue to operate on Fridays and Saturdays to pay salaries and exchange currency

    1 shares
    Share 0 Tweet 0
Deir Ezzor Electricity equips the second transformer with a capacity of 125 mega volts
Eastern & western countryside

Deir Ezzor Electricity equips the second transformer with a capacity of 125 mega volts

by Editorial Board
16/08/2026
0

...

Read moreDetails
After 12 years.. Families of Shaitat massacre victims continue to search for missing persons

After 12 years.. Families of Shaitat massacre victims continue to search for missing persons

16/08/2026
Post offices in Hasakah continue to operate on Fridays and Saturdays to pay salaries and exchange currency

Post offices in Hasakah continue to operate on Fridays and Saturdays to pay salaries and exchange currency

15/08/2026
The first direct and regular flights between Cologne, Germany, and Deir Ezzor, starting in September

The first direct and regular flights between Cologne, Germany, and Deir Ezzor, starting in September

15/08/2026
Opening of a modern drinking water desalination plant in Markada, Hasakah countryside

Opening of a modern drinking water desalination plant in Markada, Hasakah countryside

14/08/2026
  • Featured news
  • Interviews
  • Studies
  • Articles
  • Info Graphic
  • Reports
  • Maps
  • Forefathers land
  • Press
  • Photos from Homeland
  • Video Graphic
  • D24 Magazine
Designed and developed by 

DeirezZor24: Speaking Reality, Building Awareness

No Result
View All Result
  • Featured news
  • News
    • Eastern countryside
    • Deir ez-Zor City
    • Eastern & western countryside
    • Western countryside
    • Northern countryside
  • Reports
  • Violations
    • Daesh
    • Syrian regime
  • العربية

DeirezZor24: Speaking Reality, Building Awareness